Supervision of Sewage Treatment System Installations





Following the grant of planning permission for a new or replacement Wastewater Treatment System many local authorities will require that the applicant/developer shall submit a certificate stating that the wastewater treatment system including each of its parts have been installed in accordance with the terms of planning permission, the environmental protection agency code of practice “Wastewater Treatment and Disposal System Serving Single Houses (p.e. < 10)” & the manufacturer’s instructions. This certificate shall also include relevant photographs and as constructed records of the instillation.

The local authority will also require that the person certifying the Wastewater Treatment System submits an insurance certificate confirming that the qualified person referred to above held up-to-date professional indemnity at the time of preparation of the installation certificate. MOL Engineers are fully insured and can supervise and certify the instillation of your new Wastewater Treatment System. We can also project manage the instillation and appoint a competent contractor to carry out the instillation if required.